First lift for ALE's CC8800-1

Premium Content

10 May 2010

ALE performs its first lift with its new Terex CC 8800-1 crawler

ALE performs its first lift with its new Terex CC 8800-1 crawler

The first job for international heavy transport and lifting company ALE's new Terex CC 8800-1 lattice boom crawler crane was a 1,457 tonne reactor lift in Sines, Portugal.

The reactors were transported from Italy to Portugal using a 1,800 tonne capacity self-geared vessel. They were loaded on to 68 axle lines of self-propelled modular transporter (SPMT) and transferred to the refinery 7 km from the harbour. At the refinery the reactors were erected using the CC8800-1. Tailing was done with an ALE-designed gantry.

* Look out for the energy and petrochemical feature appearing in the May issue of IC

How to influence construction buyers in an AI world
The buyer journey is now more complicated than ever before, thanks to the AI world. What should construction marketers do to reach their buyers?
A smart cold play: How cold milling can offer a better bottom line for Latin American road contractors
Faced with tight margins, operator shortages and calls for more operational transparency, highway contractors are embracing digitalisation in their cold milling applications
How smarter milling can boost productivity for Latin American road contractors
As contractors across the region face tighter margins, operator shortages and growing demands for transparency, automation and digitalisation are becoming increasingly important in cold milling operations