Germany's longest bridge

29 January 2009

A six-year project to construct Germany's longest bridge is underway in the Saale District of Sachsen-Anhalt.

When complete in 2012, the 8.6 km-long Saale-Elster Viaduct on the Erfurt–Leipzig/Halle high-speed rail line, will be the longest bridge in Germany.

"Part of the route for the bridge runs through nature reserves where there is no access, so much of the bridge is being constructed using complex cantilevering," said a Schwing spokesman.

Initial concreting at the eastern end of the bridge was completed using Schwing S42 SX truck mounted concrete pumps operated by Kann Beton.

Hochtief then specified Schwing SP 2800 and SPB 30 stationary concrete pumps and placing booms at both ends of the bridge so that they could ‘travel' with the Doka cantilevered falsework. Approximately 200000 m3 of concrete will be used for the construction.

Latest News
EquipmentShare mulls US IPO in 2025
Construction equipment rental company equipment share could go public as early as next year (2025), according to a report by Bloomberg.
New Teupen spider for multiple markets
Product aimes at US market follows Teupen’s acquisition by Altec
Dragon crushers continuing to gain in popularity
Company owner and director presents the CR400 model to Intermat crowds