ic020508.xml

Premium Content

06 May 2008

To move its piling rigs around, Tye Plant division of Colets Piling in the UK has bought a new tri-axle trailer designed to offer, among other improvements, reduced maintenance costs and reduced service time.

King Trailers re-designed the removable neck GTL70 to reduce weight and increase payload. A new steering system improves manoeuvrability and the 7.32 m deck has an angled leading edge to make loading easier.

Will fuel-agnostic engines power the next era of construction?
Flexible engine platforms are emerging as a way to balance performance, flexibility and future regulatory demands
Beyond torque: The challenge of power management for crushing equipment
How OEMs and operators are managing to maximise uptime for equipment that has to pass the ultimate stress test on a daily basis
Crawler-mounted boom lifts rise to the challenge of bridge work
From remote creek beds to inner city overpasses, crawler-mounted boom lifts are proving indispensable for bridge construction, inspection and maintenance