ic030605.xml

Premium Content

25 April 2008

A Vanson Cranes VC15 from a range of self erecting tower cranes is designed to reduce on-site costs and icrease operational efficiency. To reduce erection and dismantling costs VC towers are designed to be erected in a smaller working envelope than conventional towers. On sites in congested urban areas the confines of a site can make the use of other types of lifting equipment impractical, Vanson said. In addition, the jib folds in half so the crane does not have to oversail neighbouring property. • For more on self erecting tower cranes in confined spaces see the feature starting on page 46.

Engineering certainty: Lift planning’s expanding role in heavy industry
Driven by tighter critical lift procedures, heavier loads, and shrinking field experience, lift planning now sits at the center of construction execution
Istanbul – the world’s next meeting place
Levent Baykal, organiser of Komatek, the largest construction exhibition in Türkiye, talks to KHL’s Content Studio about his plans to put people at the heart of the show
The future of off-highway power is about integration, not just innovation
OEMs face growing complexity in powertrain decisions – but clarity is emerging around efficiency and uptime