ic030640.xml

Premium Content

25 April 2008

Monta Rent's Montalift 194 S working in a historic prison building at Haarlem in the Netherlands. Steel ballast is used because the only access to the site was a window, where the crane was put through in modules

Mobility and compactness allows Montalift cranes to work on short term city jobs where mobile folding tower cranes are too large. In this case steel frames were placed on the roof of an inner city building in Amsterdam by a four wheel drive model 194 S

The right tire for the right application
When the demands of a jobsite dictate tire selection, field knowledge and data are key to optimising fleet performance
Why material recovery is becoming a competitive advantage for demolition contractors
As construction and demolition waste recovery demands increase, so does the need to make the process more efficient
Engineering demolition in a live industrial environment: The Matosinhos Refinery
When established methods are not enough, safety has to drive the solution