ic040511.xml

Premium Content

06 May 2008

To assemble a new refinery in Shanghai, China, engineers used a 1250 tonne maximum capacity Terex-Demag CC 8800 crawler. The refinery vessels are more than 100 m long and weigh more than 500 tonnes

Smarter by design: How intelligent excavators are delivering better jobsite results
Integrated technology is helping contractors improve accuracy, productivity and control without neglecting the fundamentals of machine performance
Choosing the right AWP for a constrained jobsite
A look at how site restrictions and task requirements inform aerial platform selection
The right tire for the right application
When the demands of a jobsite dictate tire selection, field knowledge and data are key to optimising fleet performance