ic110735.xml

Premium Content

26 February 2008

For raising the new 292 m landmark tower of Melbourne – the Eureka building – a Favelle Favco M380D was operated with slim climbing tower inside a lift shaft. The traditional three beam internal climbing procedure pushed the machine, which weighs about 180 tonnes, skywards

The changing role of power units in off-highway equipment
Isuzu describes how pre-validated systems can lighten the engineering load for OEMs
How installation determines alignment success in rotating machinery
Roman Megela explains the impact of installation quality on machine reliability, energy-efficiency and sustainability
Building the intelligent mine: Why integration will define mining’s next era
Yu Xiao Ying, Head of Smart Mining Projects at Zoomlion on how and why mining is entering a period of profound transformation