ic110735.xml

Premium Content

26 February 2008

For raising the new 292 m landmark tower of Melbourne – the Eureka building – a Favelle Favco M380D was operated with slim climbing tower inside a lift shaft. The traditional three beam internal climbing procedure pushed the machine, which weighs about 180 tonnes, skywards

How a modular test system overcame a genset bottleneck
When rising demand threatened to outpace a genset manufacturer’s testing capacity, a modular test cell bridged the gap – and laid the groundwork for future growth.