ic110735.xml

Premium Content

26 February 2008

For raising the new 292 m landmark tower of Melbourne – the Eureka building – a Favelle Favco M380D was operated with slim climbing tower inside a lift shaft. The traditional three beam internal climbing procedure pushed the machine, which weighs about 180 tonnes, skywards

Beyond the prototype: How simulation can reduce equipment lifecycle costs
Connecting design, testing and service can help manufacturers improve machine performance and reduce repeated engineering work
The right tire for the right application
When the demands of a jobsite dictate tire selection, field knowledge and data are key to optimising fleet performance