ic110735.xml

Premium Content

26 February 2008

For raising the new 292 m landmark tower of Melbourne – the Eureka building – a Favelle Favco M380D was operated with slim climbing tower inside a lift shaft. The traditional three beam internal climbing procedure pushed the machine, which weighs about 180 tonnes, skywards

Classification crossroads: simplifying contractor classes
Simplifying contractor classification while leaving US state-level challenges intact
Precision Crane assists with bridge repair
Cranes were crucial for a highway repair job in Pennsylvania, USA