icon090528.xml

Premium Content

08 May 2008

Main contractor Taisei Corporation of Japan is currently conducting pile load tests at property developer Nakheel's Al Mas Tower, Dubai. The 350 m high, 65-storey, 160000 m2 tower includes a four level basement with parking for 1700 cars. Part of the Jumeirah Lakes development it will be the focal point of the Dubai Metals and Commodity Centre. It will house the region's only diamond exchange – the Dubai Diamond Exchange (Almas means ‘diamond’ in Arabic). Construction is scheduled to finish in 2007. Faithful & Gould is the project manager and WS Atkins & Partners is the consultant.

Building operational resilience in industrial engine applications
The hidden costs of equipment downtime start long before failure
Parked in plane sight: Why GSE fleets rely on large spark-ignited engines
Examining how proven technology can help airport fleets balance uptime, cost, flexibility and lower emissions
Accessing aging infrastructure: Choosing the right AWP for the application
How site conditions determine which aerial work platform is best suited to the project