Key indexes

Premium Content

01 May 2008

Index Beginning of period End of period Change Change (%)
CEE (Equipment) 124,16 117,45 -6,71 -5,41
CEM (Materials) 112,57 114,44 1,87 1,67
CEC (Contractors) 126,43 130,98 4,55 3,60
CET (Total) 119,61 119,17 -0,43 -0,36
Dow 10456 10279 -177 -1,69
FTSE 100 4910 4945 35 0,71
Topix 500 937 905 -32 -3,42
CAC 40 4032 4111 79 1,96
DAX Composite 382 391 9 2,23
Period: Week 12 – 15
Accessing aging infrastructure: Choosing the right AWP for the application
How site conditions determine which aerial work platform is best suited to the project
The evolution of construction site safety: Why smart machines matter
Intelligent intervention that can help contractors prevent incidents without compromising productivity
How smart equipment is improving jobsite productivity
In the face of rising costs, tighter margins and labor shortages, there has never been a greater need to make the best use of every hour on site