Liebherr adds to Peak Waste's handling fleet

Premium Content

27 July 2011

Peak Waste Recycling has taken delivery of its first Liebherr waste handler - an 18 tonne A 316 Litronic wheeled unit that has been supplied in long reach industrial specification.

This is the first Liebherr to join Peak's fleet and it will carry out loading and unloading duties at the company's Ashbourne site in Derbyshire, UK, from where the company carries out waste collection, recycling and reclamation services for a wide range of waste, including construction and demolition waste.

The A 316 supplied to Peak features an elevating cab, a 3.5 m (11.5 ft) stick with tilt kinematics and a 5.5 m (18 ft) industrial straight boom to provide maximum lift height and long reach capability.

How to influence construction buyers in an AI world
The buyer journey is now more complicated than ever before, thanks to the AI world. What should construction marketers do to reach their buyers?
A smart cold play: How cold milling can offer a better bottom line for Latin American road contractors
Faced with tight margins, operator shortages and calls for more operational transparency, highway contractors are embracing digitalisation in their cold milling applications
How smarter milling can boost productivity for Latin American road contractors
As contractors across the region face tighter margins, operator shortages and growing demands for transparency, automation and digitalisation are becoming increasingly important in cold milling operations