New crawlers

Premium Content

10 April 2008

Model Maker Working Height (m) Basket Load (kg) Width (mm) Slope Capability Outreach (max, m) Weight (kg)
CS 135E CTE 13 200 780 31% 6.3 1600
Spider 15.75 Platform Basket 15 200 780 24° 7.8 1850
C.18/8 Bluelift 18 200 1100 26% 8 2200
Spider 18.75 Platform Basket 18 200 780 24° 8.5 2000
K 622/DAT Tecchio 21.6 265 1200 30% 10.8 2900
Elefant S41 SUP 41 200 1800 25% 15 NA
The right tire for the right application
When the demands of a jobsite dictate tire selection, field knowledge and data are key to optimising fleet performance
Why material recovery is becoming a competitive advantage for demolition contractors
As construction and demolition waste recovery demands increase, so does the need to make the process more efficient
Engineering demolition in a live industrial environment: The Matosinhos Refinery
When established methods are not enough, safety has to drive the solution