New Korea bridge inspection

By Euan Youdale15 March 2019

Korea bridge

An underbridge inspection unit has been supplied to Korea Infrastructure and Safety Corporation in South Korea for the inspection and maintenance of a new bridge on the Jinju City river.

Manufactured in Italy by Barin and assembled on a Scania P410 LB 8x4 truck chassis, the AB 20SL/B4T model occupies one lane, either in transport or work configuration, allowing traffic to traffic flow on the second lane. The AB model can work underbridge and overhead, like an aerial platform.

The model has a bridge barrier clearance 4.6m, sidewalk clearance of 4.4m, horizontal outreach underbridge of 20m, vertical depth underbridge of 24.5m, with a basket capacity 280kg. GVW 35 is tonnes.

 

 

 

Latest News
UN reviews global infrastructure construction
Researchers examine the economic benefits and environmental risks of road and rail projects
Aggreko to buy loadbank specialist
Aggreko and Crestich agree on £122 million offer
Lendlease Europe ‘halves emissions in one year’
Real estate and infrastructure firm cuts its Scope 1 and 2 carbon levels by 53%