New Korea bridge inspection

Premium Content

15 March 2019

Korea bridge

An underbridge inspection unit has been supplied to Korea Infrastructure and Safety Corporation in South Korea for the inspection and maintenance of a new bridge on the Jinju City river.

Manufactured in Italy by Barin and assembled on a Scania P410 LB 8x4 truck chassis, the AB 20SL/B4T model occupies one lane, either in transport or work configuration, allowing traffic to traffic flow on the second lane. The AB model can work underbridge and overhead, like an aerial platform.

The model has a bridge barrier clearance 4.6m, sidewalk clearance of 4.4m, horizontal outreach underbridge of 20m, vertical depth underbridge of 24.5m, with a basket capacity 280kg. GVW 35 is tonnes.

 

 

 

Smart lifting: How to balance cost and safety
Rental experts discuss equipment strategies for today’s complex lifting challenges
How microgrids are powering the data center boom
As the global demand for data grows, businesses are looking beyond the grid for uninterrupted operation
Demolition & Recycling International October-December 2025
Demolition & Recycling International November-December 2025