New Korea bridge inspection

15 March 2019

Korea bridge

An underbridge inspection unit has been supplied to Korea Infrastructure and Safety Corporation in South Korea for the inspection and maintenance of a new bridge on the Jinju City river.

Manufactured in Italy by Barin and assembled on a Scania P410 LB 8x4 truck chassis, the AB 20SL/B4T model occupies one lane, either in transport or work configuration, allowing traffic to traffic flow on the second lane. The AB model can work underbridge and overhead, like an aerial platform.

The model has a bridge barrier clearance 4.6m, sidewalk clearance of 4.4m, horizontal outreach underbridge of 20m, vertical depth underbridge of 24.5m, with a basket capacity 280kg. GVW 35 is tonnes.

 

 

 

Latest News
Latest episode of Construction Briefing podcast now available
New episode of Construction Briefing podcast focuses on Ukraine 
Sany America rolls out new RT
At the ARA show in New Orleans last month, Sany debuted a new 55-ton capacity rough terrain crane.
Peri debuts new formwork system
In response to a surge in U.S. construction, Peri USA has develoed a new formwork solution that caters to various size ranges for wall, column, and slab formwork