Official opening for O’Donovan depot

Premium Content

11 May 2016

His Excellency Dan Mulhall, Ambassador of Ireland to Great Britain (third from left) joins members o

His Excellency Dan Mulhall, Ambassador of Ireland to Great Britain (third from left) joins members of the O'Donovan family as he offiically opens the new O'Donovan Waste Disposal London depot

O’Donovan Waste Disposal has officially opened its latest London facility, a £15 million (US$23 million) depot in Alperton.

The company, which has been in the capital for nearly 60 years, is still a family run business. Its turnover is now more than £16 million (US$24 million) and the company serves the demolition industry as well as waste disposal customers.

The official opening was performed by His Excellency Dan Mulhall, the Ambassador of Ireland to Great Britain.

The company said: “Sustainability is paramount for us as we look to protect what we currently have and also for our future generations.

“The key focus for Alperton is to enable us to recycle as much as possible into recoverable and reusable materials.”

The right tire for the right application
When the demands of a jobsite dictate tire selection, field knowledge and data are key to optimising fleet performance
Why material recovery is becoming a competitive advantage for demolition contractors
As construction and demolition waste recovery demands increase, so does the need to make the process more efficient
Engineering demolition in a live industrial environment: The Matosinhos Refinery
When established methods are not enough, safety has to drive the solution