Peri assists in Bamburgh Castle restoration

Premium Content

05 December 2013

The Peri Up scaffold system on site at Bamburgh Castle

The Peri Up scaffold system on site at Bamburgh Castle

Scaffolding provider Peri has been providing its Peri Up modular scaffold system for restoration works being carried out at Bamburgh Castle in Northumberland, UK.

Last restored in 1900, the castle team are carrying out work to the outer curtain wall, removing vegetation and re-pointing stonework. Access to the wall’s façade is being provided via the Peri Up modular scaffold system, which is serving as a working platform with integrated access.

Simon Edgell of Bamburgh Castle said, “We are pleased with the adaptability and safety of the Peri Up system. Technical and product support on site has been excellent.”

An intelligent machine ecosystem: Zoomlion’s approach to the future of mining
How a combination of autonomy, remote control, electrification and digital intelligence is helping mining operators improve safety, productivity and sustainability
Will fuel-agnostic engines power the next era of construction?
Flexible engine platforms are emerging as a way to balance performance, flexibility and future regulatory demands
Beyond torque: The challenge of power management for crushing equipment
How OEMs and operators are managing to maximise uptime for equipment that has to pass the ultimate stress test on a daily basis