Peri assists in Bamburgh Castle restoration

Premium Content

05 December 2013

The Peri Up scaffold system on site at Bamburgh Castle

The Peri Up scaffold system on site at Bamburgh Castle

Scaffolding provider Peri has been providing its Peri Up modular scaffold system for restoration works being carried out at Bamburgh Castle in Northumberland, UK.

Last restored in 1900, the castle team are carrying out work to the outer curtain wall, removing vegetation and re-pointing stonework. Access to the wall’s façade is being provided via the Peri Up modular scaffold system, which is serving as a working platform with integrated access.

Simon Edgell of Bamburgh Castle said, “We are pleased with the adaptability and safety of the Peri Up system. Technical and product support on site has been excellent.”

Southwest Industrial Rigging gets new owner and leadership team
Entering a new era but aspiring to continue Harry Baker’s legacy
Trail King debuts automatic kingpin steering trailers
New trio hailed as a fundamental shift in heavy-haul equipment design
How a modular test system overcame a genset bottleneck
When rising demand threatened to outpace a genset manufacturer’s testing capacity, a modular test cell bridged the gap – and laid the groundwork for future growth.