Potain tower plays in Verona Arena

04 January 2017

A Potain MDT98 tower crane changed theatrical sets between opera productions for Verona Arena in Ita

A Potain MDT98 tower crane changed theatrical sets between opera productions for Verona Arena in Italy in 2016

A Potain MDT98 tower crane was used at the famed Verona Arena in Italy to change theatrical sets between productions for its entire 2016 opera season.

Verona, Italy-based Toffoli Macchine rented the 6 tonne capacity crane for the project, which had the crane use its 55 metre jib radius to reach over the arena’s walls and assemble sets during the day.

By night the crane helped dismantle the scenery. It replaced a Potain GTMR 386 B that was formerly used for this job for 15 years.

Latest News
EquipmentShare mulls US IPO in 2025
Construction equipment rental company equipment share could go public as early as next year (2025), according to a report by Bloomberg.
New Teupen spider for multiple markets
Product aimes at US market follows Teupen’s acquisition by Altec
Dragon crushers continuing to gain in popularity
Company owner and director presents the CR400 model to Intermat crowds