Silo move for Airland

05 October 2020

Denmark-headquartered international freight forwarding and project logistics solutions provider Airland Logistics was responsible for unloading operations, stevedoring, clearance, and delivery of 15 silos for a dairy factory in Southern Jutland region of Denmark.

Airland Logistics took charge of the silos at Esbjerg port and then used specialized trucks to transport them 70 km to the factory. The silos measured up to 25 metres long and 5.32 metres in diameter. The total weight of all 15 silos was 380 tonnes. Due to their size and weight, route surveying was required.

The silos will be used for the expansion of the dairy factory to cater for an increased demand for mozzarella.

Silo move for Airland

Silo move for Airland

Silo move for Airland

Silo move for Airland

Silo move for Airland

Silo move for Airland

Latest News
Stafford Crane Group appoints Mike Posener
Crane media and construction industry veteran joins tower crane and hoist specialist
Why are Germany’s construction workers going on strike?
Workers to strike after deal was rejected
Custom Truck repurposes WWII-era building for fabrication
Constructed from the shell of a 1940s steel mill building, “H” was purpose-built for boom trucks.