Sines of success

07 September 2010

ALE transported reactors, weighing up to 1,457 tonnes, from Italy to the Sines refinery in Portugal. A 1,800 tonne capacity self-geared vessel was used to move the reactors before they were loaded on to 68 axle lines of self-propelled modular transporter (SPMT) and transferred to the refinery 7 km from the harbour. At the refinery the reactors were erected using a Terex Demag CC8800-1 crawler crane. Tailing was done with an ALE-designed gantry.

Latest News
EquipmentShare mulls US IPO in 2025
Construction equipment rental company equipment share could go public as early as next year (2025), according to a report by Bloomberg.
New Teupen spider for multiple markets
Product aimes at US market follows Teupen’s acquisition by Altec
Dragon crushers continuing to gain in popularity
Company owner and director presents the CR400 model to Intermat crowds