Gantry crane transported to Kazakhstan

Premium Content

KGE Baltic recently handled the multimodal transport of a disassembled gantry crane from various locations in Europe to Altynkol in Kazakhstan, close to Chinese border.

(Photo: KGE Baltic)

The long beams measured 28 metres long with a weight of 34 tonnes.

The total transit time for the cargo was around 25 days including border crossings.

KGE provided daily updates and tracking for their customer. All cargo was successfully delivered to the final destination.

(Photo: KGE Baltic)
Latest News