New wind turbine transport system from Huisman

By Christian Shelton04 June 2021

Schiedam, Netherlands-based heavy construction equipment designer and manufacturer Huisman has launched a wind turbine component feeder vessel with a Motion Compensated Platform.

It is designed to quickly and safely transfer wind turbine components from a feeder vessel. It complies with the USA’s Jones Act enabling the safe transportation and lifting of turbine components in USA waters.  

Read more about wind power transportation in the June issue of ICST, out 14th June.
Read more about wind turbine erection in the July issie of ICST, out 12th July

Latest News
ERA publishes cybersecurity guide for equipment rental companies
Free downloads include a model ‘first 48 hours’ emergency response plan for a cyber attack
Aggreko develops its first hydrogen genset
The first 50 kVA hydrogen combustion generator has been tested and 10 additional units are now being built
Caterpillar to develop all-electric mining fleet
World’s largest construction OEM working to produce all-electric mining fleet