Video - 2012 Aquatic Centre
06 April 2010
New video from the London 2012 Olympic Delivery Authority (ODA) shows construction and the testing of the Zaha Hadid-designed Aquatics Centre dive pool and two 50 m swimming pools. The three concrete pools are being tested with over 10 million litres of water before being sealed and lined with 180000…