Paseo del Bajo road corridor

06 February 2018

Work is underway on a 7.1km road corridor, called Paseo del Bajo, that will improve connections between the north and south of Argentina’s capital, Buenos Aires.

The project is being carried out by state-owned Autopistas Urbanas and the Old Puerto Madero Corporation, on behalf of the Ministry of Urban Development and Transportation of Buenos Aires, for US$650 million.

Latest News
Platform Basket delivers first 54m spider
The innovative 54T spider goes to Minoege
Andy Wright joins UK power specialist
Former Sunbelt UK CEO appointed executive chair
Stantec acquires UK-based engineering design rival Hydrock
Canadian engineering firm Stantec has bought its UK-based engineering design rival Hydrock, in a move that it said would strengthen its UK offering.