The Barge Master supply test

02 December 2014

The Barge Master T700, seen here, has a payload capacity of 700 tonnes and is designed to accommodate a crane to lift a load of 160 tonnes at 12 m radius. It can be used to supply components and equipment, including transition pieces, wind turbine components and bridge sections

Latest News
How did Saudi Aramco perform this major lift at Fadhili gas plant?
Early 2021 saw a critical lift performed at the Fadhili gas plant in Saudi Arabia when a reboiler tube was removed for inspection. Mustafa Al Abdulmohsin reports
Onshore construction completed for Triton Knoll
UK’s longest ever offshore wind cabling project concludes after three years
Sinoboom to give away scissor at ARA Show
Sinoboom North America will be giving away a Sinoboom 1330SE electric scissor lift in celebration of attending its first ARA Show