Video - 2012 Aquatic Centre

06 April 2010

New video from the London 2012 Olympic Delivery Authority (ODA) shows construction and the testing of the Zaha Hadid-designed Aquatics Centre dive pool and two 50 m swimming pools. The three concrete pools are being tested with over 10 million litres of water before being sealed and lined with 180000 tiles. Testing of the dive pool and training pool is complete and the competition pool starts being filled this week.
Latest News
Utilizing crane attachments in specialized applications
With custom attachments, cranes can be used for a variety of tasks, mainly in shoring up foundations for bridges or other structures.
Demo specialist transfers expertise to mining
Jet Demolition offering turnkey service including shaft sealing
New Cat excavator ‘delivering on sustainability’
Cat 350 said to consume up to 13% less fuel than previous models