Video - 2012 Aquatic Centre

06 April 2010

New video from the London 2012 Olympic Delivery Authority (ODA) shows construction and the testing of the Zaha Hadid-designed Aquatics Centre dive pool and two 50 m swimming pools. The three concrete pools are being tested with over 10 million litres of water before being sealed and lined with 180000 tiles. Testing of the dive pool and training pool is complete and the competition pool starts being filled this week.
Latest News
The Utility Expo hits record visitors
More than 21,000 attendees at Louisville show
United Rentals makes show of strength at Utility Expo
Rental company takes biggest stand ever at Lousiville show