Video: The making of the new Genoa Bridge

17 April 2020

Genoa bridge pic

Animation of work at height concluding on the new Genoa Bridge

Italian construction company Salini Impregilo’s video animation demonstrates the speed and skill with which the soon-to-be-completed Genoa Bridge is being designed and constructed.

Amid the coronavirus crisis, Salini, along with its joint venture construction partner Fincantieri, has raced ahead with the project, using its ‘fast-track’ model, in an effort to restore Genoa’s position as a major port and commercial hub.

Nicola Meistro, general manager domestic operations at Salini Impregilo, said, “It is the success of a marvellous, cohesive team. All of our people have shown a great ability to adapt to this new context. It is thanks to them, and the suppliers and the rest of the production chain that work alongside us every day in full respect of the rules, that the Genoa Bridge is a model for Phase 2 for all of Italy, a country of people who in times of difficulty know how to roll up their sleeves in a show of confidence and courage.”

Latest News
LGMG restructures N.A. operations
LGMG to relocate N.A. headquarters, build $140 million manufacturing facility in Mexico for access equipment 
New Effer loader cranes
Three new Effer cranes broaden the heavy crane range and offer advantages for end users
New Ferrari loader cranes
F.lli Ferrari adds to hydraulic loader crane range with new 6000 series models