Boost for geothermal energy in Indonesia

Premium Content

31 March 2014

Development of the 320 MW Sarulla Geothermal Power Development Project in North Sumatra, Indonesia, has been supported by a U$ 1.17 billion loan package from international investors.

The Asian Development Bank (ADB) provided US$ 350 million of the total financial package, while six commercial banks – Bank of Tokyo-Mitsubishi UFJ, ING Bank, Mizuho Bank, National Australia Bank, Société Générale, and Sumitomo Mitsui Banking Corporation – also co-financed the 30-year energy sales deal.

ADB said Indonesia currently used coal and oil to produce 65% of its electricity and fuel its economic growth. The country has vowed to increase the share of renewable energy in its primary energy supply from 5% in 2010 to 25% by 2025, and reduce greenhouse gas emissions by 26% by 2020. Geothermal plants typically produce less than 10% of the greenhouse gas emitted by fossil-fuelled thermal plants.

The evolution of electromobility in construction
The case for electric construction equipment is now as much about productivity and business value as it is about sustainability
Why crawler AWPs are becoming essential to modern mining and tunnelling
While excavators, loaders and TBMs dominate the spotlight, crawler aerial work platforms are quietly transforming how mining and tunnelling projects are built, maintained and operated.
Beyond the logo: Why content is the engine of successful B2B brand transformation
KHL Content Studio’s Jon Abrahams on how a new identity may capture attention, but it’s understanding that builds trust