Bank funds Polish rail works

Premium Content

08 June 2014

The European Investment Bank (EIB) is to provide €268 million in financing to PKP Polskie Linie Kolejowe (PLK), for the upgrade of 58km of an existing electrified railway line (E30) from Katowice to Kraków.

PKP, the manager of the national railway network in Poland, will implement a number of improvements on this section of track, including the replacement of ballast, sleepers, track and overhead catenary, as well as upgrading the existing power supply. Several stations will also be reconstructed to ensure full accessibility for people with reduced mobility.

Once complete, the modernised line will allow for the introduction of trains running at a maximum speed of 160km/h for passenger trains and 120km/h for freight trains.

The EIB funding will also facilitate environmental measures, including noise barriers, better drainage and animal crossings.

The improvement works will begin this year and will be completed by the end of 2016.

Accessing aging infrastructure: Choosing the right AWP for the application
How site conditions determine which aerial work platform is best suited to the project
The evolution of construction site safety: Why smart machines matter
Intelligent intervention that can help contractors prevent incidents without compromising productivity
How smart equipment is improving jobsite productivity
In the face of rising costs, tighter margins and labor shortages, there has never been a greater need to make the best use of every hour on site