Hyundai’s US$ 5 billion deal for Russian factory

Premium Content

05 September 2016

A consortium led by Hyundai Engineering has won a KRW 5.6 trillion (US$ 5.16 billion) contract to build fertilizer plants in Kozmino in Nakhodka, Russia.

Along with Hyundai E&C and the Japanese engineering firm Toyo, Hyundai Engineering will build two ammonia production plants with a combined daily capacity of 6,700 tonnes, two urea plants with combined daily capacity of 6,100 tonnes, and a methanol plant with a daily capacity of 3,000 tonnes.

The deal was signed following a meeting of the Korean president Park Geun-hye and her Russian counterpart Vladimir Putin in Vladivostok.

The consortium, which was selected as a preferred bidder for the plants in September 2014, was awarded the contract by Russia’s Nakhodka Mineral Fertilizers Factory, a subsidiary of the National Chemical Group.

The construction of the plants is set to be completed in 62 months.

How smart technology is changing the crawler dozer workplace
Technology is helping dozer operators work more safely, accurately and consistently
Have your say: Help shape the State of Marketing 2027 report
Have your say: Help shape the State of Marketing 2027 report
2027 European Rental Awards open for entries
Includes new awards category for ‘People’ initiatives. Deadline for entries is 26 February 2027.