Eiffage for hydropower plant

Premium Content

10 October 2018

appli_cote_divoire2_1

Artistic rendering of the Singrobo-Ahouaty hydropower plant

French contractor Eiffage has been awarded a turnkey design-build contract for the Singrobo-Ahouaty hydropower plant in Côte d’Ivoire.

Worth almost €110 million, the contract was awarded by Ivory Hydro Energy and along with the civil engineering design it covers the manufacture, installation and commissioning of all hydromechanical, electromechanical and electrical equipment.

Using the expertise of its subsidiaries Eiffage Génie Civil and Eiffage Énergie Systèmes, Eiffage will construct a mixed rock and concrete dam, a spillway, a plant housing the turbines, a rejection channel, a departure station, a line connecting the plant to the plant network, temporary facilities and access roads.

Work on the 44MW plant will begin in the first quarter of 2019 and will take three years to complete.

How smart technology is changing the crawler dozer workplace
Technology is helping dozer operators work more safely, accurately and consistently
Have your say: Help shape the State of Marketing 2027 report
Have your say: Help shape the State of Marketing 2027 report
2027 European Rental Awards open for entries
Includes new awards category for ‘People’ initiatives. Deadline for entries is 26 February 2027.