Sponsored Content - Sarens loads wind farm module onto barge in Belguim

Premium Content

18 February 2019

img-20180610-wa0001_498x280

December 2018: In June of 2018, Sarens was at the site of Engie Fabricom in Hoboken, Belgium, to weigh and load a topside module onto the Sarens barge “Paula”. The load weighed 4.200T, with a height of 35m, length of 75m, and width of 40m.

This particular topside module was actually a large transformer slated for installation in the middle of the Hohe See Offshore Wind Farm off Germany’s coast, where it would connect to the seashore as well as to all of the farm’s windmills.

Ten crew members were involved in weighing and loading the module at the quay. To execute the operation successfully, they used the following equipment:

  • 4 x 34 axle lines K24ST
  • 16 x weighing cell 500T
  • Sarens barge “Paula” 

One of the main challenges the crew faced was performing a roll-on operation onto a tidal river, which required careful contingency plans.

Sarens would like to recognise everyone who helped make this important operation a success.

Inside Zoomlion’s Smart Factory: How digital manufacturing could rewrite the rules for heavy equipment
Zoomlion’s new excavator factory in Changsha is not simply faster or more automated than traditional plants; it represents a fundamental rethink of how construction equipment can be designed, built, and delivered
Donaldson to lift the lid on ArmorSeal in upcoming webinar
Expert panel will discuss new air filtration technology designed to improve durability, serviceability and performance – February 19.
First expert speaker announced for power transition webinar
Moog Construction’s Dr Nate Keller to join panel for February 17 event