R Collard upgrades crushing plant

Premium Content

03 March 2020

United Kingdom-based demolition and recycling company R Collard has invested £2 million (US$2.6 million) in a new fixed crushing line.

R.Collard's fized crushing plant will be operational in March 2020

R Collard’s fixed crushing plant will be operational this month

Manufactured by crushing and screening specialist Duo, the new plant has been customised to Collard’s own specifications and design and is currently being installed at the company’s site in the south of England.

Due to be fully assembled and operational this month, the new plant will produce recycled aggregates in five different sizes – ranging from +40 mm to -5 mm.

It will allow Collard to produce around 250 t of recycled aggregates an hour – a 200% increase on the company’s current production capacity.

As well as increasing production of recycled aggregates, the plant will also feed Collard’s ready-mix concrete production.

Beyond the prototype: How simulation can reduce equipment lifecycle costs
Connecting design, testing and service can help manufacturers improve machine performance and reduce repeated engineering work
The right tire for the right application
When the demands of a jobsite dictate tire selection, field knowledge and data are key to optimising fleet performance