Bulgaria selects Struma motorway tender

Premium Content

20 November 2019

a motorway

The Struma motorway in Bulgaria

Bulgaria’s Road Infrastructure Agency has selected the winning tender for the next phase of its Struma motorway project, which is to be built in the south west of the country.

The Struma motorway will pass east from Kresna Gorge for a total of 24km from Kresna to Krupnik.

Open-price tenders for Lot 3.2.1., relating to a 13.2km section of road, were submitted to the agency from a total of three companies.

A consortium, comprising the companies Groma Hold, Evropeiski Patishta, Vodno Stroitelstvo-Blagoevgrad and Partroekt, was chosen with tender was priced at around €325 million (BGN 636 million).

The infrastructure project includes the design and construction of multiple overpasses and underpasses, as well as three road junctions and three tunnels with ventilation, fire alarm, power and traffic management systems.

The project, which will receive partial funding from the European Union’s Cohesion Fund, has a completion deadline of 1556 days - just over four years.

Its planned route through the Kresna Gorge – an EU Natura 200 network area, home to 92 protected species – has been met with substantial opposition from local communities and environmental groups around the world, which have called upon the European Commission to take legal action against the Bulgarian government.

Will fuel-agnostic engines power the next era of construction?
Flexible engine platforms are emerging as a way to balance performance, flexibility and future regulatory demands
Beyond torque: The challenge of power management for crushing equipment
How OEMs and operators are managing to maximise uptime for equipment that has to pass the ultimate stress test on a daily basis
Crawler-mounted boom lifts rise to the challenge of bridge work
From remote creek beds to inner city overpasses, crawler-mounted boom lifts are proving indispensable for bridge construction, inspection and maintenance