Heavy lift and transportation specialist ALE has carried out the weighing, jacking and load-out of an offshore jacket and platform in Mexico.

The work started with the jack-up of the topside, which weighed over 13,000 tonnes. It was lifted 14 metres using ALE’s Mega Jack system.

The topside was then loaded-out using a rapid ballasting system with a capacity of 16,000 Cu.M/Hr. The ballasting system was designed and supplied by ALE’s specialist offshore services team.

Using strand jacks and kicker jacks, the offshore services team then pulled the topside a distance of 196.63 metres onto the client’s barge to complete the load-out.

According to ALE, health, safety and the environment were paramount considerations throughout the project and ALE said all operations were supervised centrally in real-time to ensure operational flow.

“This is a fantastic achievement for all of the ALE teams involved,” explained Simon Armstrong, project manager for ALE – Offshore Services. “Throughout this project, we have established a strong on-site partnership to meet our client’s technical needs. By finding a solution that could integrate our systems easily with the client’s needs, we delivered effective methodology, and the proven upscaling of the yard makes it a more attractive site for future operations.”

Image 1

The topside was loaded out using a rapid ballasting system designed and supplied by ALE’s specialist offshore services team

Newsletter

Delivered directly to your inbox World Crane Week features the pick of the breaking news stories, product launches, show reports and more!

Sign up for free

Newsletter

Delivered directly to your inbox World Construction Week features the pick of the breaking news stories, product launches, show reports and more!

Go to newsletters