Sines of success

Premium Content

07 September 2010

ALE transported reactors, weighing up to 1,457 tonnes, from Italy to the Sines refinery in Portugal. A 1,800 tonne capacity self-geared vessel was used to move the reactors before they were loaded on to 68 axle lines of self-propelled modular transporter (SPMT) and transferred to the refinery 7 km from the harbour. At the refinery the reactors were erected using a Terex Demag CC8800-1 crawler crane. Tailing was done with an ALE-designed gantry.

LiuGong announces electric theme for Vertikal Days
Range of battery-electric lifts set to complement new company theme at September show 
How to influence construction buyers in an AI world
The buyer journey is now more complicated than ever before, thanks to the AI world. What should construction marketers do to reach their buyers?
A smart cold play: How cold milling can offer a better bottom line for Latin American road contractors
Faced with tight margins, operator shortages and calls for more operational transparency, highway contractors are embracing digitalisation in their cold milling applications