Sines of success

Premium Content

07 September 2010

ALE transported reactors, weighing up to 1,457 tonnes, from Italy to the Sines refinery in Portugal. A 1,800 tonne capacity self-geared vessel was used to move the reactors before they were loaded on to 68 axle lines of self-propelled modular transporter (SPMT) and transferred to the refinery 7 km from the harbour. At the refinery the reactors were erected using a Terex Demag CC8800-1 crawler crane. Tailing was done with an ALE-designed gantry.

First expert speaker announced for power transition webinar
Moog Construction’s Dr Nate Keller to join panel for February 17 event
Is total cost of ownership now the real measure of equipment value?
As sustainability pressures, technology and rising operating costs reshape construction economics, contractors are looking beyond purchase price to understand what machines truly cost over their lifetime
How Donaldson is putting the seal on innovative filtration
When you’re working with machinery, uptime is money – so why allow downtime on a jobsite to be triggered by something as unglamorous as an air filter?