Barin AB carries out Indooroopilly bridge works

Premium Content

20 March 2014

Lincon Hire’s new Barin AB 10.5 Combi underbridge inspection unit at work on the Indooroopilly Railw

Lincon Hire’s new Barin AB 10.5 Combi underbridge inspection unit at work on the Indooroopilly Railway bridge

Lincon Hire Ltd of Darra, Queensland, was recently brought in to supply a Barin AB 10.5 Combi underbridge inspection unit for works on the Indooroopilly Railway bridge.

The 208.5 m long Indooroopilly Railway bridge is made of a steel truss design. It crosses the Brisbane River, providing links to Indooroopilly and Chelmer stations.

The AB 10.5 Combi, recently delivered to Lincon Hire, can be used for rail and road work. Its bucket can be deployed from both the left and right side of the vehicle. For road service, it offers a maximum horizontal underbridge reach of 10.5 and an overhead reach of 14 m.

For rail service it offers a maximum horizontal underbridge reach of 10.5 m and an overhead reach of 13.3 m.

The machine is fitted on a standard three-axle Scania truck, which is also fitted with railway axles. The machine can run on two different railway gauges: 1067 m and 1435 m.

Webinar: Caterpillar experts to discuss the increasing importance of temporary power
Live event on July 7, will explore how businesses are using temporary power solutions to strengthen energy resilience
Product launch update: new tower cranes
New tower cranes launched into the North American market this year
Why rugged electronics are becoming mission-critical for off-road OEMs
Connectivity and digital controls are reshaping heavy equipment and manufacturers are finding performance depends as much on durable electronics as on the vehicles themselves