Excavation work begins for US clean water project

Premium Content
A TBM has begun work on a 5.5m diameter tunnel in Seattle, US

Italian contracting giant Webuild has announced that Lane, its US subsidiary, has started excavating the 2.7 mile (4.2km) storage tunnel for the Ship Canal Water Quality Project, in the city of Seattle, US.

The environmental sustainability project is designed to prevent untreated stormwater and sewage from flowing into major bodies of water in Seattle. A tunnel boring machine (TBM) has begun work on the 5.5m diameter tunnel.

The tunnel will prevent up to 75 million gallons (276 million litres) of untreated stormwater and sewage from flowing into the Lake Washington Ship Canal, Salmon Bay and Lake Union every year. The tunnel will capture and temporarily hold more than 29 million gallons (109.8 million litres) of stormwater and sewage during heavy rainfall.

According to Lane, this project is one of several in the clean water sector in the US that the company are currently working on.

See where WeBuild ranked in an exclusive listing of the world’s biggest contractors by sale in 2020 in the most recent issue of International Construction magazine. 

How smart technology is changing the crawler dozer workplace
Technology is helping dozer operators work more safely, accurately and consistently
Have your say: Help shape the State of Marketing 2027 report
Have your say: Help shape the State of Marketing 2027 report
2027 European Rental Awards open for entries
Includes new awards category for ‘People’ initiatives. Deadline for entries is 26 February 2027.