H.E. Services orders 85 Mecalac dumpers

Premium Content

03 December 2018

UK rental company H.E. Services (Plant Hire) Ltd has ordered 85 Mecalac site dumpers, a mix of TA1eh, TA3sh, TA6 and TA9 models.

The dumpers - produced at Mecalac’s facility in Coventry, UK, acquired from Terex two years ago – have several added features, including road lights, a green beacon seatbelt system (with ‘Start Inhibit’), and Trackunit telematics and immobilisation systems.

HEServicesMecalacPhotoCW-small

H.E. Services’ dumpers leaving the Mecalac facility in Coventry, UK.

Peter Durey, Managing Director at H.E. Services, said; “Our priority is to provide rental professionals with robust, reliable and highly-capable compact equipment to perform in the toughest conditions and deliver outstanding results.

“We have a successful working relationships with the Mecalac team. By choosing their latest site dumper models to expand our fleet, we can continue to provide our customers with reliable, productive and highly-efficient plant equipment to hire.”

Paul Macpherson, UK Sales and Marketing Director at Mecalac CEUK, added, “At Mecalac, we’re committed to developing innovative products and game-changing technologies to support rental market requirements. Our 2018 range comprises our most advanced and capable units ever – offering the perfect solution for any fleet.”

Inside Zoomlion’s Smart Factory: How digital manufacturing could rewrite the rules for heavy equipment
Zoomlion’s new excavator factory in Changsha is not simply faster or more automated than traditional plants; it represents a fundamental rethink of how construction equipment can be designed, built, and delivered
Donaldson to lift the lid on ArmorSeal in upcoming webinar
Expert panel will discuss new air filtration technology designed to improve durability, serviceability and performance – February 19.
First expert speaker announced for power transition webinar
Moog Construction’s Dr Nate Keller to join panel for February 17 event