Impregilo in Qatar contract win

Premium Content

25 October 2012

Italian contractor Impregilo has been awarded a €100 million (US$ 130 million) contract to construct a storm water drainage tunnel in Doha, Qatar.

Issued by the Public Works Authority of Qatar, the design and build contract involves the construction of a main 9.5 km water collection tunnel with a diameter of 4.5 m, and the construction of 21 access shafts.

Impregilo said two tunnel boring machines would be used for the excavation of the tunnel. It added that work on the project was scheduled to be completed in four years.

Bobcat innovation leader to speak at industry electrification webinar
Joel Honeyman will discuss the practical realities of bringing electrification into off-highway equipment, at February 17 event
From scale to flexibility: Inside the development of Zoomlion’s Smart Factory
Mr Shi Heng, assistant to the general manager of Zoomlion Zvally Co Ltd, on the future of heavy equipment manufacturing
Crane strike reveals strain in UK construction
Government policy failures highlighted by UK tower crane operator strike, CPA chief says