TCA delivery tops Saudi Arabian tower

Premium Content

17 December 2012

The Falcon Spider is hoisted 400 m above the city to its new home atop the Makkah clock tower in Sau

The Falcon Spider is hoisted 400 m above the city to its new home atop the Makkah clock tower in Saudi Arabia

TCA Lift has successfully completed the delivery of a Falcon Spider FS420 tracked platform to the top of the Makkah Clock Tower in Saudi Arabia.

The FS420 had to be hoisted 400 m above the city to be delivered to its new home. The platform, which offers a working height of 42 m, will now be used to perform maintenance and cleaning works at the Islamic Museum and Lunar Observation Centre, also housed in the 76-storey building.

Towering at a height of 600 m, the Makkah Clock Tower is the second tallest building in the world, after the Burj Khalifa in Dubai. Its 400 m clock is five times larger than that of the Houses of Parliament in London.

Construction equipment buyers: 3 insights suppliers can’t ignore
How are construction equipment buying decisions changing, and what does that mean for suppliers?
The uptime problem that’s hiding in your equipment’s fluid
Why contaminant control is crucial to the performance and value of your construction equipment