World’s highest

Premium Content

25 April 2008

The Liebherr LG 1750, working with a 91 m main boom, installs the machinery house

The Liebherr LG 1750, working with a 91 m main boom, installs the machinery house

In Germany, Nolte Auto-Kran used its Liebherr LG 1750 to erect what is claimed to be the highest wind turbine in the world. The lattice tower that would house the turbine stood at 160 m high, weighed 350 tonnes and was located at Laasow, near the city of Cottbus.

The crane was configured with a 91 m main boom, 77 m of luffing jib, a 31.5 m derrick and 225 tonnes of counterweight to complete the erection of the turbine.

The heaviest and highest lift of the erection was the placing of the 61 tonne machinery house, which had to be hoisted to just over 160 m at a radius of 35 m. •

How smart technology is changing the crawler dozer workplace
Technology is helping dozer operators work more safely, accurately and consistently
Have your say: Help shape the State of Marketing 2027 report
Have your say: Help shape the State of Marketing 2027 report
2027 European Rental Awards open for entries
Includes new awards category for ‘People’ initiatives. Deadline for entries is 26 February 2027.