World’s highest

Premium Content

25 April 2008

The Liebherr LG 1750, working with a 91 m main boom, installs the machinery house

The Liebherr LG 1750, working with a 91 m main boom, installs the machinery house

In Germany, Nolte Auto-Kran used its Liebherr LG 1750 to erect what is claimed to be the highest wind turbine in the world. The lattice tower that would house the turbine stood at 160 m high, weighed 350 tonnes and was located at Laasow, near the city of Cottbus.

The crane was configured with a 91 m main boom, 77 m of luffing jib, a 31.5 m derrick and 225 tonnes of counterweight to complete the erection of the turbine.

The heaviest and highest lift of the erection was the placing of the 61 tonne machinery house, which had to be hoisted to just over 160 m at a radius of 35 m. •

How to influence construction buyers in an AI world
The buyer journey is now more complicated than ever before, thanks to the AI world. What should construction marketers do to reach their buyers?
A smart cold play: How cold milling can offer a better bottom line for Latin American road contractors
Faced with tight margins, operator shortages and calls for more operational transparency, highway contractors are embracing digitalisation in their cold milling applications
How smarter milling can boost productivity for Latin American road contractors
As contractors across the region face tighter margins, operator shortages and growing demands for transparency, automation and digitalisation are becoming increasingly important in cold milling operations