Turkish tenders

Premium Content

04 September 2012

The Fatih Sultan Mehmet bridge, Istanbul.

The Fatih Sultan Mehmet bridge, Istanbul.

Five prequalification tender applications had been made for the privatisation of a number of Turkish bridges and highways by the time a revised deadline of yesterday, 3 September, elapsed.

The tenders have come from Vinci Concessions Holding plus four joint ventures - Zorlu Holding and OHL Concesiones; Nurol Holding, MV Holding, Alsim Alarko Sanayi Tesisleri ve Ticaret, Kalyon İnşaat Sanayi ve Ticaret, and Fernas İnşaat; Autostrade Per I'Italia, Doğus Holding, Makyol İnşaat Sanayi Turizm ve Ticaret, and Akfen Holding; Koç Holding, UEM Group Berhad, and Gözde Girişim Sermayesi Yatırım Ortaklığı.

The contracts are for the construction, maintenance, repair and operation, together with access roads, of two bridges - the Bosphorus Bridge and the Fatih Sultan Mehmet Bridge and ring motorway.

There will also be various motorways. These include the Edirne-İstanbul-Ankara, Pozantı-Tarsus-Mersin, Tarsus-Adana-Gaziantep, Toprakkale-İskenderun, Gaziantep-Şanlıurfa, İzmir-Çeşme, and İzmir-Aydın roads, plus the İzmir and Ankara ring motorway.

The roads and bridges are being privatised in a single package covering 25 years, and include the service facilities, maintenance and operating facilities, and fee collection centres.

The prequalification date was delayed until 3 September. The final bidding date, which had been 9 August, is now 31 October, 2012.

Engineering certainty: Lift planning’s expanding role in heavy industry
Driven by tighter critical lift procedures, heavier loads, and shrinking field experience, lift planning now sits at the center of construction execution
Istanbul – the world’s next meeting place
Levent Baykal, organiser of Komatek, the largest construction exhibition in Türkiye, talks to KHL’s Content Studio about his plans to put people at the heart of the show
The future of off-highway power is about integration, not just innovation
OEMs face growing complexity in powertrain decisions – but clarity is emerging around efficiency and uptime