John Holland chooses Sennebogen for Sydney

Premium Content

07 February 2014

A Sennebogen 613 telescopic crawler begins work to help renovate the Sydney Opera House in Australia

A Sennebogen 613 telescopic crawler begins work to help renovate the Sydney Opera House in Australia

Construction company the John Holland Group is using a Sennebogen 613 telescopic crawler crane to help renovate the Sydney Opera House in Australia.

The John Holland Group has been contracted as part of an AUS$ 100 million (US$ 89 million) project to make an open area in front of the Opera House safer and more clearly arranged for pedestrians.

The development will include an underground loading area, new entry routes, and a sewer with storage capacity and overflow for possible storm tides, a company spokesperson said.

The Sennebogen 613 was hired from Preston group. It has capacity of 16 tonnes and is fitted with a 35 kN winch. Power comes from a 91 kW Deutz diesel engine. The crawler is being used to help construct the foundations of the sub-construction. Tasks include lifting 3 tonne steel mesh netting pipes into bores, a spokesperson said. For the project the crawler has been fitted with a drilling rig.

Work is due to be completed in 2014.

Parked in plane sight: Why GSE fleets rely on large spark-ignited engines
Examining how proven technology can help airport fleets balance uptime, cost, flexibility and lower emissions
Accessing aging infrastructure: Choosing the right AWP for the application
How site conditions determine which aerial work platform is best suited to the project
The evolution of construction site safety: Why smart machines matter
Intelligent intervention that can help contractors prevent incidents without compromising productivity