Hyundai’s US$ 5 billion deal for Russian factory

05 September 2016

A consortium led by Hyundai Engineering has won a KRW 5.6 trillion (US$ 5.16 billion) contract to build fertilizer plants in Kozmino in Nakhodka, Russia.

Along with Hyundai E&C and the Japanese engineering firm Toyo, Hyundai Engineering will build two ammonia production plants with a combined daily capacity of 6,700 tonnes, two urea plants with combined daily capacity of 6,100 tonnes, and a methanol plant with a daily capacity of 3,000 tonnes.

The deal was signed following a meeting of the Korean president Park Geun-hye and her Russian counterpart Vladimir Putin in Vladivostok.

The consortium, which was selected as a preferred bidder for the plants in September 2014, was awarded the contract by Russia’s Nakhodka Mineral Fertilizers Factory, a subsidiary of the National Chemical Group.

The construction of the plants is set to be completed in 62 months.

Latest News
Update: SAIA Canadian Council
New gaps analysis tool in development will address specific requirements for scaffold and access equipment across Canada’s provinces
Mott MacDonald buys up engineering and energy consultancy company
Engineering, management and development consultancy Mott MacDonald has bought Australian consultancy firm Merz Consulting
McDermott executes its heaviest lift
See how much the company lifted for this offshore project