Barin underbridge heads to Bangalore

Premium Content

19 December 2016

Barin AB 12/S during commissioning training in December.

Barin AB 12/S during commissioning training in December.

A new AB 12/S bucket type underbridge inspection unit from Barin is operating in India.

Bangalore’s Planning & Road Asset Management Centre (Pramc) and the Public Works, Ports & Inland Water Transport Department (PWP&IWTD) chose the Barin model mounted on a 3-axle Volvo FM330 Hp 6x2 rigid truck chassis.

As with all in Barin’s range, the AB 12/S uses one lane of the highway in transport position and in work configuration.

Features of the machine included a bridge barrier clearance of 3.5m, a sidewalk clearance of 3m, horizontal outreach underbridge of 12m and a vertical depth underbridge of 16.5m. maximum overhead outreach is 15.2m, while bucket capacity 280 kg and GVW is 16 tonnes.

Panel announced for ‘Hidden Cost of Heat’ webinar
Experts will discuss how smarter cooling can improve uptime, reduce costs and boost equipment performance
The new power equation
As fuel and engine options expand, OEMs are taking a more strategic approach to matching power with application
Alternative fuels: The importance of overcoming contamination
How good fuel management and advanced filtration can help fleets adopt lower-carbon fuels without sacrificing uptime or component life.