Foundations for a sustainable flame

By Steve Skinner18 November 2008

Work begins on energy efficient Dubai Towers.
Foundation work for the Dubai Towers in Dubai has started. The concept for the towers comes from candlelight, and the completed structures will feature sustainable energy systems such as a 3 kW aero turbine, 315 PV panels to harvest 50 kW of solar power, under floor air distribution and a design that reduces solar heat gain by up to +31%. “We used parametric modeling to cut design time by +50%, a system that also enabled us to conduct quick and accurate studies of the exterior shape options, structural systems and shapes for interior atriums,” said lead concept designer Behr Champana of TVS International.
Latest News
World Demolition Awards 2021 - the results
All the headline makers from 14 categories as annual industry event becomes in-person once again
Kubota extends engine warranty for select markets
New warranties for specific machines and equipment starts in 2022
US announces tariff ruling on Chinese MEWP imports
Chinese MEWP OEMs could face significant import duties if ruling is upheld in November