Guggenberger uses Sennebogen 643 in Neutraubling

Premium Content

24 June 2014

The Sennebogen 643 M helps construct the storage canal

The Sennebogen 643 M helps construct the storage canal

Construction company Guggenberger, based in Mintraching, Germany, used a Sennebogen 643 M wheeled telescopic crane to help build a storage canal at a housing development in Neutraubling.

The 40 tonne capacity 643 M is lifting prefabricated concrete elements into position. The crane was configured with 43 metre boom and fly boom to cover all areas of the site. The heaviest component lifted so far weighed 9.8 tonnes. The storage canal will be used to channel rain water and a small brook.

The 643 M has a four-point outrigger system and a Maxcab cab, which can be tilted 15 degrees for a better view of operations.

Kabalen retires; Bray promoted at A1A Software
Bruce Kabalen calls it a day, Brittany Bray promoted
How rental businesses can modernise for growth
As margins tighten and expectations rise, rental firms embracing simple, data-led technology will be best placed to scale up and unlock new growth
Time to apply for an Engineeered Giving scholarship
30 June deadline for nonprofit foundation established by Engineered Rigging