Liebherr heavy lift crane completes overload test

25 January 2013

Liebherr BOS 35000 heavy lift offshore crane on the Caballo Marango

Liebherr BOS 35000 heavy lift offshore crane on the Caballo Marango

A Liebherr heavy lift crane has completed an overload test at a port in Germany.

The BOS 35000 lifted 1,100 tonnes, which is 110 % of its maximum lifting capacity, the company said.

The crane offers a maximum boom length of 102 metres. It will be used for reconstruction work on oil rigs in the Gulf of Mexico.

The heavy lift crane is installed on the Caballo Marango, a support vessel in the port of Rostock, Germany and will work for the Mexican service company Oceanografia.

Latest News
HSC updates 100 and 180 tonne crawler cranes
Stage V engines among changes for third generation lattice crane models
Road closures during bridge replacement
Plan ahead to avoid possible delays resulting from new footbridge installation works
India’s economic tailwinds propel Larsen & Toubro’s construction business growth
A strong Indian economy and the strengthening of physical and digital infrastructure in the country has helped the country’s biggest contractor, Larsen & Toubro to grow further