Robbins main beam breaks through Ohio River Tunnel
16 October 2020
Crews celebrated as a refurbished 6.7m (22-foot) diameter Robbins Main Beam TBM and conveyor system broke through the Ohio River Tunnel on 22 September after overstress in the crown resulted in several challenges.
“At first glance, this seems…