Strand jacks

08 May 2008

• Lift by pulling, in tension.

• Wider range of applications. Can be used through 360 degrees.

• Large crane usually required to place cross-beam and jacking system on top of structure.

• Whole system can be testedbefore lifting, structure as well as jacks.

• System must be fully assembled before starting lift.

• Heavier structure to withstandforce of loads.

• In the event of a jack failing, change-out required at height.

• Pressure transducers in jacks weigh loads.

Latest News
CSCEC-built spiral tunnel officially recognised as world’s longest
A spiral tunnel in China, built by Chinese construction giant China State Construction (CSCEC), has been recognised as the world’s longest
Consortium wins €302m deal to build Swiss railway plant
A consortium led by Swiss construction company CSC Costruzioni has won a contract worth €302 million (US$327 million) to build a new railway plant in Switzerland
Epiroc to acquire French attachments manufacturer
Swedish OEM continues massive attachments expansion following Stanley acquisition