Strand jacks

Premium Content

08 May 2008

• Lift by pulling, in tension.

• Wider range of applications. Can be used through 360 degrees.

• Large crane usually required to place cross-beam and jacking system on top of structure.

• Whole system can be testedbefore lifting, structure as well as jacks.

• System must be fully assembled before starting lift.

• Heavier structure to withstandforce of loads.

• In the event of a jack failing, change-out required at height.

• Pressure transducers in jacks weigh loads.

Istanbul – the world’s next meeting place
Levent Baykal, organiser of Komatek, the largest construction exhibition in Türkiye, talks to KHL’s Content Studio about his plans to put people at the heart of the show
The future of off-highway power is about integration, not just innovation
OEMs face growing complexity in powertrain decisions – but clarity is emerging around efficiency and uptime
A Chinese OEM’s view of construction equipment today – and tomorrow
LiuGong’s Andrew Ryan believes forward-thinking OEMs must combine local execution, useful tech and a greater focus on total cost of ownership