Wet asbestos demolition trial

Premium Content

10 April 2008

The method, which has been previously trialled elsewhere in the USA away from residential areas, involves the soaking of the walls and ceilings of asbestos contaminated buildings with a special foam and then tearing down the building using heavy equipment without removing the asbestos.

If the technique proves effective, it would make it much less costly for such structures to be demolished.

Current federal regulations require that the asbestos be removed from buildings before they are demolished, adding to the cost and complexity of the demolition process.

The structure demolished was the office building on the Oak Hollow apartment complex, which is being brought down. The rest of the buildings that make up the complex are to be demolished using traditional asbestos removal/demolition techniques.

NCCCO Foundation launches Crane Career Advisor program
New resource offering guidance to people interested in working in the crane sector
Engineering certainty: Lift planning’s expanding role in heavy industry
Driven by tighter critical lift procedures, heavier loads, and shrinking field experience, lift planning now sits at the center of construction execution
Istanbul – the world’s next meeting place
Levent Baykal, organiser of Komatek, the largest construction exhibition in Türkiye, talks to KHL’s Content Studio about his plans to put people at the heart of the show