Kiswire invests in offshore

Premium Content

09 November 2009

Korean rope manufacturer Kiswire is building a new plant for the production of large wire ropes for offshore and mining applications.

The Neptune 2 facility in Tanjung Langsat, on the east coast of Johor, Malaysia will begin production in the third quarter of 2011.

The equipment inside the factory will be capable of manufacturing wire rope up to 600 tonnes in non-rotating, multi-strand constructions. The output capacity of Neptune 2 will be 25,000 tonnes a year. This will be in addition to the existing Neptune 1 plant output of 25,000 tonnes a year.

With this investment Kiswaire says it hopes to be ready to service the needs of offshore and mining in the future.

The evolution of electromobility in construction
The case for electric construction equipment is now as much about productivity and business value as it is about sustainability
Why crawler AWPs are becoming essential to modern mining and tunnelling
While excavators, loaders and TBMs dominate the spotlight, crawler aerial work platforms are quietly transforming how mining and tunnelling projects are built, maintained and operated.
Beyond the logo: Why content is the engine of successful B2B brand transformation
KHL Content Studio’s Jon Abrahams on how a new identity may capture attention, but it’s understanding that builds trust